Cobalt Blue Quarterly Report June 2017

Highlights:

  • FY17 (8,000m) Drilling Campaign Concluded – a globally significant cobalt program – continues into FY18.
  • Thackaringa Resource Upgrade – 54.9Mt at 910ppm cobalt, new estimate reflects a 66% increase in overall tonnes and a 9% increase in cobalt grade.
  • Scoping Study Delivered – Results supportive of Cobalt Blue’s aspirational target of becoming “a long-life top 10 cobalt miner”. Outstanding metallurgical results.
  • 40 Mt Indicated Resource target and major geophysical survey announced – exciting option to uncover further cobalt anomalies.
  • Cobalt sulphate commands a market premium driven by the evolving battery market.
Read more...

Related News

Posted by cobaltblueholdings | October 26, 2017
Bulk Metallurgical Testwork – Strong Concentration Results
The Thackaringa project is planning to mine ore from three surface deposits. The host rock (silica and feldspars) contains approximately 20% sulphides (mainly pyrite), with cobalt at 900–1000 ppm. Upgrading...
Posted by cobaltblueholdings | October 18, 2017
Cobalt Blue Quarterly Report – September 2017
September 2017 – Highlights Projects Thackaringa Project Commenced Pre-Feasibility Study (PFS). Aerial geophysical survey launched and subsequently completed over the entirety of the Thackaringa tenements (EL6622, EL8143, ML86 & ML87)....
Posted by cobaltblueholdings | September 27, 2017
CEO’s Letter to Shareholders – September 2017
Update for September 2017 Cobalt Blue (ASX:COB) has achieved considerable progress since listing on the ASX in February 2017. COB’s recently completed Thackaringa drilling campaign (8,000 metres) declared a combined...